MOQ: | 1 set |
Price: | US $ 9500-11100 / set |
Standard Packaging: | Conventional Packing |
Delivery Period: | 8-15 workdays |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 5000 sets/per Year |
Item |
Unit |
6 cubes |
10 cubes |
15 cubes |
Structural form |
/ |
Tank type |
Tank type |
Tank type |
Traction length |
m |
2.35 |
1.96 |
2.4 |
Spray width |
m |
10-15 or above |
10 or above |
10-15 or above |
Machine size (L×W×H) |
mm |
6100×2000×2700 |
7340×2540×2700 |
7600×2700×3350 |
Machine weight |
kg |
2100 |
3210 |
5020 |
Tire type |
/ |
400/55-22.5 |
500/60-22.5 |
500/60-22.5 |
Supporting power |
hp |
70 |
100 |
150 |
MOQ: | 1 set |
Price: | US $ 9500-11100 / set |
Standard Packaging: | Conventional Packing |
Delivery Period: | 8-15 workdays |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 5000 sets/per Year |
Item |
Unit |
6 cubes |
10 cubes |
15 cubes |
Structural form |
/ |
Tank type |
Tank type |
Tank type |
Traction length |
m |
2.35 |
1.96 |
2.4 |
Spray width |
m |
10-15 or above |
10 or above |
10-15 or above |
Machine size (L×W×H) |
mm |
6100×2000×2700 |
7340×2540×2700 |
7600×2700×3350 |
Machine weight |
kg |
2100 |
3210 |
5020 |
Tire type |
/ |
400/55-22.5 |
500/60-22.5 |
500/60-22.5 |
Supporting power |
hp |
70 |
100 |
150 |